Project Deliverables

Annual Report 2012 Annual Report 2013

D3.5 Integrated TaaS system (M18)

Deliverable can be dowloaded here.

D3.6 Initial terminological data for Shared Term Repository (M18)
Deliverable can be dowloaded here.

D4.2 Web interface for Terminology services for language workers (M22)

Deliverable can be dowloaded here.

D4.3 Integration with CAT tools (M22)
Deliverable can be dowloaded here.

D4.4 Integration with SMT systems (M22)
Deliverable can be dowloaded here.

D5.2 Introductory leaflet and poster (M6)

Introductory project poster can be downloaded here.
Introductory project leaflet can be downloaded here.

D5.4 Mid-term leaflet and poster (M15)

Mid-term project poster can be downloaded here.
Mid-term project leaflet can be downloaded here.

D5.6 Exploitation plan and Exploitation agreement (M20)

Deliverable can be dowloaded here.

D5.7 Final leaflet and poster (M24)
Deliverable can be dowloaded here.

D5.8 Final report on dissemination and implementation (M24)

Deliverable can be dowloaded here.

D5.9 TaaS Workshop 1 (M18)
Deliverable can be dowloaded here.

D5.10 TaaS Workshop 2 (M24)
Deliverable can be dowloaded here.

Final Project Summary

Deliverable can be downloaded here.

ICT PSP
The research within the project TaaS leading to these results has received funding from the European Union Seventh Framework Programme (FP7/2007-2013), grant agreement no 296312
0